Kitchen Remodel Cost Guide

Straight answers on what kitchen projects cost in Valrico, Brandon and the rest of Tampa Bay, and how to plan yours without surprises.

Get a free estimate
1 · Cost by project level

Three levels of kitchen project

Most kitchens fall into one of three levels. The biggest jumps in price come from replacing cabinets and from moving plumbing, gas or electrical.

Level 1 · Armstrong fixed price

Cosmetic refresh

$5,900 – $10,600

Our Kitchen Refresh packages, from a 10×10 to a 12×15 kitchen. Same layout, big change in look.

  • Cabinet painting (when cabinets are paintable)
  • New hardware, faucet and light fixtures
  • Laminate counters and tile backsplash
  • Fresh wall paint; larger sizes add a sink, trim, LED and pendant lighting
Level 2 · Tampa Bay market range

Minor remodel

About $15,000 – $30,000

Keeps the layout and most cabinet boxes, with new surfaces throughout.

  • Quartz or stone counters
  • New cabinet doors or refacing
  • New flooring, sink and lighting
  • Some new appliances
Level 3 · Tampa Bay market range

Full remodel

About $35,000 – $65,000+

New cabinets and often a new layout. Larger kitchens, custom cabinetry and moved walls push past this range.

  • All-new cabinetry and counters
  • Plumbing, gas or electrical moves
  • New appliance package
  • Flooring, lighting and finishes

Level 1 prices are Armstrong’s published package prices. Level 2 and 3 ranges are typical Tampa Bay figures from public cost reports (see sources at the end), not Armstrong quotes. For reference, the 2025 Cost vs. Value report put the national average for a minor kitchen remodel at about $28,500 and a major midrange remodel at about $82,800. We price Level 2 and 3 work after a walkthrough of your kitchen.

2 · What drives cost

Where the money goes

Cabinets

Usually the biggest line item. Painting cabinets in good shape costs a fraction of replacing them; refacing sits in between.

Countertops

Laminate is the budget choice, butcher block is mid-range, and quartz or stone costs more but lasts. Edges, cutouts and seams add up.

Layout changes

Moving a sink, range or wall means plumbing, gas, electrical and permits. Keeping the layout is the single best way to control cost.

Hidden conditions

Water damage under the sink, outdated wiring or uneven subfloors only show up once demo starts. That’s what a contingency is for.

Size

More linear feet of cabinets and counters means more material and labor. That’s why our refresh prices step up by kitchen size.

Selections

Fixtures, tile, hardware and appliances vary widely. Choosing them before work starts avoids delays and change orders.

3 · Setting your budget

A simple way to set your number

Designers often suggest budgeting about 15% of your home’s value for a full kitchen remodel. On a $350,000 home, that’s roughly $52,500. A refresh or minor remodel can come in far below that.

Then add a contingency of 10–20% for surprises found during demo. If you don’t use it, it stays in your pocket.

Resale

What comes back when you sell

Smaller projects tend to pay back best. National Cost vs. Value data shows a minor kitchen remodel recouping close to all of its cost at resale, while a major midrange remodel returned about half. If you plan to sell within a few years, a refresh or minor remodel is usually the smarter spend.

4 · Ways to save

Get more kitchen for your money

5 · Permits

Permits in Hillsborough County

Cosmetic work like painting and replacing a faucet usually doesn’t need a permit. Moving or adding plumbing, gas or electrical, or changing walls, generally does. A licensed contractor pulls the permit and schedules the inspections. Ask any contractor for their Florida license number and check it on the state DBPR license lookup. Ours is CRC-1333464.

Timing

How long it takes

As a rough guide, a minor remodel takes about 2–4 weeks, a mid-range remodel about 6–10 weeks, and a full gut renovation can take 3–5 months. Custom cabinets and special-order materials add lead time before work starts. We confirm your timeline in writing before we begin.

6 · Aging in place

Plan for the next 20 years, not just the next 5

If the walls and cabinets are already open, a few upgrades cost little now and make the kitchen easier to use for years.

Reach

Pull-out shelves and drawers in base cabinets instead of deep shelves you have to kneel for.

Grip

Lever or touch faucets and D-shaped pulls that are easy on hands.

Light

Under-cabinet task lighting and brighter, even overhead light.

Footing

Slip-resistant flooring and smooth transitions between rooms.

7 · Planning checklist

Before you get estimates

Sources for market figures: CMK Construction, Tampa kitchen remodel cost; CMK Construction, average Tampa kitchen remodel cost and timelines; NerdWallet, kitchen remodeling costs (2025 Hanley Wood / Cost vs. Value data); Axios Tampa Bay, kitchen remodel budgeting. Market ranges change; your estimate is based on your kitchen.